[ 04 ] Questions
The things clients actually ask us.
If your question is not here, send it over — we would rather answer it before you commit than after.
[ 01 ]
Getting started
Use the estimator on the contact page for an indicative range, then send us the site location and a rough brief. We come back with a survey scope and a banded figure. A firm number needs a soil report and a drawing set — we will tell you exactly what is missing before we quote.
On projects we are shortlisted for, the preliminary level survey and site walk are at our cost. A full geotechnical investigation with borehole logs is billable, and we will tell you the figure before we start.
Around 2,500 sq ft of built-up area for new construction, or roughly ₹40 lakh of interior fit-out. Below that we are usually not the most economical choice and we will say so.
Yes, across Rajasthan. Beyond about 250 km we add a mobilisation cost for site establishment and staff accommodation, shown as a separate line in the BOQ.
[ 02 ]
Cost and billing
It is a range, not a quote. It uses current per-square-foot rates for Jaipur by specification tier and gives roughly ±15% accuracy on a straightforward site. Soil conditions, approvals, site access and finish selections all move the real number.
Against measured work, not calendar dates. Your consultant certifies the measurement book each month, and payment is released against that certification. There is a mobilisation advance at award and a retention held through the defect liability period.
Scope changes go into a variation log, priced and signed before the work is done. Market rate movement on steel and cement is handled through the price variation clause in the contract, which is capped and stated at award.
No. All rates are quoted exclusive of GST, which is shown separately on every invoice at the applicable rate for works contracts.
[ 03 ]
During the build
One site engineer, named at award, who stays on your project until handover. You also get the project manager's direct number. You will not be routed through a call desk.
Weekly progress photographs and a fortnightly written report against the programme. On larger projects we run a shared folder with drawings, approvals, test reports and the current variation log.
For specialist trades — glazing, lifts, HVAC — yes, and we name them at award. Civil, structural and finishing work is done by our own salaried teams.
[ 04 ]
After handover
A twelve-month defect liability period from handover as standard, backed by retention. Waterproofing carries a five-year warranty. Manufacturer warranties on fittings and equipment are transferred to you at closeout.
As-built drawings, the closed snag list, all test certificates, statutory approvals, warranty documents and an operation and maintenance file for the installed services.
[ 08 ] Start with the ground
Tell us the site. We will tell you what it will actually cost.
Send us a location and a rough brief. We will come back with a survey scope and an indicative range — before you commit to anything.